Commercial roofing work on warehouses, offices, industrial units, and retail premises typically runs from initial survey through to completed installation.
Call any time. Calls are answered day and night and passed straight to our roofers.
Plenty of roofing pages describe what materials they use. This page explains the process - what happens at each stage of a commercial roofing job, what you should expect, and where problems can arise if a job is not handled properly. Knowing what a good job looks like helps you ask the right questions and judge whether the work has been done to a proper standard.
A proper commercial roofing survey is not a five-minute look from the ground. It involves safe access to the roof surface itself - either by ladder and roof access hatch, or by scaffold or MEWP (mobile elevated work platform) where the roof height or condition requires it.
During the survey, the contractor should check:
The survey should produce a written record of what was found. If a contractor visits, looks around briefly, and gives you a price on the spot without any written findings, that is a warning sign.
Once the survey findings are clear, the contractor should produce a specification setting out what system is being installed, what preparation work is needed, and what the scope covers. This matters because two quotes for the same job can differ significantly if one includes full deck preparation and the other assumes the existing deck is sound.
For large commercial roof replacements, the specification should state:
Overlaying a new membrane directly over an old, failed one can save money in the short term but is not always appropriate. If the existing surface has trapped moisture beneath it, overlaying locks that moisture in and accelerates deck deterioration.
Safe access is one of the most significant logistical elements of any commercial roofing job. On a large warehouse or office building, this typically means erecting scaffold, setting up a MEWP, or using an existing roof access system. The access method affects cost and programme - scaffold takes time to erect and strike, and must be positioned without obstructing your car park, loading bay, or pedestrian routes.
Before work starts, material deliveries should be planned so that sheet materials and membrane rolls are not left exposed to wind or rain on site overnight. A good contractor factors this into the programme and does not leave materials loose on the roof at the end of each day.
If the job involves stripping an existing roof covering, this stage produces significant waste material. Old felt, insulation board, and any failed decking needs to be safely removed and disposed of. On larger commercial roofs this can run to several skips of material.
Deck preparation is critical and often underestimated. A new membrane over a poorly prepared deck will not perform as it should. The deck must be:
If deck repairs are needed, they should be completed and inspected before any new materials go on. This is the stage where unpleasant surprises can emerge - what looked like a straightforward replacement can reveal corroded steel decking or rotten OSB panels that need replacement before work can continue.
Insulation boards are laid first, either bonded with adhesive or mechanically fixed depending on the system. On flat roofs, getting the falls right at this stage is important - tapered insulation can be used to introduce or improve drainage falls where the structural deck is flat.
The waterproof membrane is then installed over the insulation. For EPDM rubber, this means rolling out large sheets and bonding or ballasting them in place, with seams formed using contact adhesive or tape. For single-ply TPO or PVC systems, seams are hot-air welded using a specialist tool that creates a bond stronger than the sheet itself when done correctly. For torch-on felt, each layer is heated and bonded in sequence.
Flashings are formed and fixed to walls and upstands, lead or aluminium used depending on the application. Every penetration through the membrane - outlets, pipes, cable routes - is sealed using compatible collar or boot flashings.
Outlets should be cleaned, re-set if they have become proud or recessed relative to the new surface, and fitted with compatible rainwater outlets that connect properly to the downpipe system. A new roof that drains poorly will fail prematurely regardless of the quality of the membrane. Where outlets are repositioned or new ones added, the downpipe connections need to be checked and updated.
Before leaving site, the completed roof should be inspected systematically - every flashing edge, every seam, every outlet collar, every penetration. On single-ply systems, seam welds can be checked using a blunt probe run along the joint, which will catch any unbonded section. Felt laps should be checked for lifted edges.
Any snagging items identified at this stage should be corrected on site before the contractor leaves. You should receive a clear record of what was done, what materials were installed, and what maintenance the roof requires going forward.
A commercial site must be left clean and safe. All waste materials, offcuts, packaging, and fixings should be cleared and disposed of properly. Skips or waste carriers should be removed without delay. The area around the building - car park, loading bay, walkways - should be checked for debris from the works, particularly metal swarf from drilling and fixing operations, which presents a tyre and foot puncture risk.
If you are choosing a contractor for commercial roofing in Attleborough or across South Norfolk, look for one who covers this whole process, working from survey through to completion. If you have a commercial roof that needs attention and want to understand what the job involves before committing, call us to arrange a site survey.